POOL DESIGN AND POSITIONING
- LAY OUT THE POOL
- CONTOUR OF LOT
- TYPE OF SOIL
- SUN EXPOSURE
- PROXIMITY TO THE HOUSEWIND
- PRIVACY
- SETBACKS
POOL DIMENSIONS AND SHAPE
- NORMAL BATHER LOAD EXPECTATIONS
- USES – SWIMMING, GAMES, AESTHETICS
- CONFORMED FOR DIVING
DECKING AND HARDSCAPE
- DECK SURFACES
- CONCRETE FINISHES
- PLANTERS
- RETAINING WALLS
UTILITY CONSIDERATIONS
- GAS-LINE FOR HEATER
- ELECTRICITY
- WATER SOURCE
- UTILITIES WITHIN THE WORK AREA OR ACCESS
CONSTRUCTION PROCESS
- CONTRACTING
- PLANS AND SPECIFICATIONS
- PERMITS AND APPROVALS
- LAYOUT AND PAINT POOL FOR EXCAVATION
- EXCAVATION
- EXCAVATION EXTRAS (LEDGE, HARDPAN, WATER)
- FLOOR PLUMBING
- STEEL REINFORCEMENT
- ELECTRICAL BONDING OF STEEL
- SPA JETS PLUMBED
- PRE-GUNITE INSPECTION
- GUNITE
- BACKFILL TO PIPE GRADE IF REQUIRED
- LONGSTUB PLUMBING FROM POOL TO EQUIP AREA
- SUBDECK GRADING (BY DECK CONTRACTOR IF NOT SSG)
- COPING AND/OR TILE
- PRE-DECK GRADING INSPECTION
- DECK FORM AND POUR
- EQUIPMENT SET
- FENCE INSTALLATION BEFORE POOL INTERIOR (BY FENCE CONTRACTOR)
- PRE-PLASTERING PREPARATIONS
- PLASTERING
- START UP
- MAINTENANCE AND OPERATIONS INSTRUCT
- FINAL INSPECTION